Search This Blog

Showing posts with label Lead Time. Show all posts
Showing posts with label Lead Time. Show all posts

Thursday, May 15, 2025

Talk Less. Wait Less. Work Smarter – Connect with Kingtronics on Teams

              Kingtronics International Company — Inspired by Innovation 


Talk Less. Wait Less. Work Smarter – Connect with Kingtronics on Teams

In a fast-moving supply chain, speed isn't just about shipping — it’s about answers.

Every engineer and sourcing manager has been there:
A quote takes two days.
Stock status needs a follow-up.
You’re juggling specs, deadlines, and emails... and still waiting.

We’ve simplified that.

📢 Kingtronics is now directly available via Microsoft Teams.

Just open a chat, drop your question, and get the information you need — in real time.

 What can you do on Teams?

  • Get instant quotes and stock updates

  • Ask technical questions and share BOMs or drawings

  • Skip email loops and get connected to the right contact

  • Communicate the way your team already works — efficiently

We're not saying goodbye to email.
But when time matters, Teams is your faster line to Kingtronics.

📩 Prefer email? We’re still at info@kingtronics.com

Thursday, September 17, 2020

 

Kt Kingtronics 3MM Ceramic Trimmer Capacitors (KKT series) Best replacement for Murata TZC3 series


Kingtronics provides a stable and good quality Ceramic Trimmer Capacitors with good lead time.

Although Murata stop offer TZC3 series, but with Kingtronics 3MM Ceramic Trimmer Capacitors (KKT series) you do not need to worry about it.  

Welcome for any inquiry.

Features
*Low capacitance drift
*High durability from vibration, dust, moisture and flux
*Color coded case permits easy identification
*Very good Q and high resonant frequency
*Designed for reflow soldering.
*Small size with external dimension of 3.2(W) x 4.5(L) x 1.5(T) mm

Applications
*Remote Keyless Entry System, Measuring Instrument
*Car Alarm Remote Controller, Car Audio, Traffic Card Reader
*Security System, Wireless Microphone
*Cordless Phone, Wireless Repeater
*Two-Way Radio Communication (FRS, GMRS, LMR)
*TCXO, VCXO, RF Module, RFID, DVD 

Product Video: https://www.youtube.com/watch?v=Men9BCDlODk

Lead Time: Regular stock ~ 4 weeks

Cross reference for Kingtronics and Murata P/N

Kingtronics P/N 

Murata P/N 

Capacitance (pF MAX)

KKT303TR (Black)

TZC3Z030 (Brown, Black)

3pF

KKT306TR (Blue)

TZC3Z060 (Blue, Black)

6pF

KKT310TR (Ivory)

TZC3Z100 (White, Black)

10pF

KKT320TR (Pink)

TZC3Z200 (Red, Black)

20pF

KKT330TR (Green)

TZC3Z300 (Green, Black)

30pF



Thursday, November 7, 2019

Kingtronics-Bridge Rectifier KBL4005-KBL410,KBU6005-KBU610,KBP2005-KBP210,GBU4005-GBU410,GBJ6005-GBJ610

Dear customers,

This is news related to you, Kingtronics Bridge Rectifier series are cancelling UL gradually, and will fully cancel UL certification in 2020. At the same time, Christmas day is approaching already to us and our office will be closed during vacation, so lead time is a little bit tight.

And also we need to consider at least one week to sign the contract, issue the PO, issue the LC or perform the advance payment. What’s more, shipment is subject to vessel availability and weather condition, and none of them is in my hands. If you place an order according to your project requirement, please confirm your order ASAP. We assure you that we will try our best to push the production and shipment.
Kingtronics Round Leads and Flat Feet Leads Bridges Rectifier as below:
1.5A Bridge Rectifiers W005-W10
 3.0A Bridge Rectifiers KBP3005-KBP310
 2.0A Bridge Rectifiers D2UB05 THRU D2UB100
 2.0A Bridge Rectifiers GBP2005-GBP210
 3.0A Bridge Rectifiers D3UB05 THRU D3UB100
 3.0A Bridge Rectifiers GBP3005-GBP310
 4.0A Bridge Rectifiers D4UB05 THRU D4UB100
 6.0A Bridge Rectifiers KBL601-KBL610
 2.0A Bridge Rectifiers KBP2005-KBP210
 4.0A Bridge Rectifiers GBL4005-GBL410
 4.0A Bridge Rectifiers KBL4005-KBL410
 4.0A Bridge Rectifiers KBU4005-KBU410
 6.0A Bridge Rectifiers KBU6005-KBU610
 8.0A Bridge Rectifiers KBU8005-KBU810
 4.0A Bridge Rectifiers GBU4005-GBU410
 10.0A Bridge Rectifiers KBU10005-KBU1010
 6.0A Bridge Rectifiers GBU6005-GBU610
 15.0A Bridge Rectifiers KBU15005-KBU1510
 8.0A Bridge Rectifiers GBU8005-GBU810
 25.0A Bridge Rectifiers KBU25005-KBU2506
 10.0A Bridge Rectifiers GBU10005-GBU1010
 25.0A Bridge Rectifiers KBU25008-KBU2510
 15.0A Bridge Rectifiers GBU15005-GBU1510
 35.0A Bridge Rectifiers KBU35005-KBU3506
 6.0A Bridge Rectifiers KBJ6005-KBJ610
 35.0A Bridge Rectifiers KBU3508-KBU3510
 6.0A Bridge Rectifiers GBJ6005-GBJ610
 20.0A Bridge Rectifiers GBU20005-GBU2010
 8.0A Bridge Rectifiers GBJ8005-GBJ810
 25.0A Bridge Rectifiers GBU25005-GBU2510
 10.0A Bridge Rectifiers GBJ10005-GBJ1010
 4.0A Bridge Rectifiers KBJ4005-KBJ410
 15.0A Bridge Rectifiers GBJ15005-GBJ1510
 8.0A Bridge Rectifiers KBJ8005-KBJ810
 20.0A Bridge Rectifiers GBJ20005-GBJ2010
 10.0A Bridge Rectifiers KBJ10005-KBJ1010
 25.0A Bridge Rectifiers GBJ25005-GBJ2510
 15.0A Bridge Rectifiers KBJ15005-KBJ1506
 35.0A Bridge Rectifiers GBJ35005-GBJ3510
 15.0A Bridge Rectifiers KBJ1508-KBJ1510
 2.0A Bridge Rectifiers 2W005-2W10
 50.0A Bridge Rectifiers GBJ50005-GBJ5010

Tuesday, August 27, 2019

Kt Kingtronics Support Zener Diodes 1N4148 and LL4148

Zener Diodes is general usage and suitable for many different applications like: Industrial, Power Management, Consumer Electronics, Portable Devices, and Automotive.
Silicon Epitaxial Planar Switching Diode 1N4148 Specification:
DO-34, DO-35 Package Silicon Epitaxial Planar Switching Diode
High-speed switching Silicon Epitaxial Planar Switching Diode
This diode is also available in MiniMELF case with the type designation LL4148
Available with 1N4148
 
Fast Switching Diode LL4148 Minimelf SOD80 Specification:
LL4148 small signal diode
Fast switching surface mount diode
Low reverse leakage
Fast switching speed
Maximum power dissipation 500mW
High stability and high reliability 

Monday, August 5, 2019

Kt Kingtronics Excellent Lead Time and Price Support for Tantalum Capacitors and Aluminum Electrolytic Capacitor – GKT, CKT, TKT


Are you looking for Tantalum Capacitors and Aluminum Electrolytic Capacitor ?

Kingtronics produces various capacitors professionally for about 30+ years with ISO & RoHS Certified.

Following are our promotional items with excellent price and lead time support, welcome share your inquiry with us to check and quote you best.

Kingtronics Kt SMD Type Aluminum Electrolytic Capacitors Factory https://www.youtube.com/watch?v=ZpMf5VRjjFU&t=1s

Kingtronics MLCC Multilayer Ceramic Capacitors Factory https://www.youtube.com/watch?v=7J2jbfXuoc4
TKT--Dipped tantalum capacitor 
Kingtronics P/N
Lead Time
1uF 35V +/-20% Pitch: 2.54mm Bulk RoHS
TKT010M3502BR
5-9 weeks
10uF 25V +/-20% Pitch: 2.54mm Bulk RoHS
TKT100M2502BR
22uF 25V +/-20% P: 2.54mm Bulk RoHS
TKT220M2502BR
CKT-Chip tantalum capacitor 
Kingtronics P/N
Lead Time
4.7uF 10V +/-20% A Case T&R RoHS
CKT4R7M160ATR 
2-5 weeks
3.3uF 6.3V +/-20% B Case T&R RoHS
CKT3R3M060BTR 
15uF 6.3V +/-20% C Case T&R RoHS
CKT150M060CTR 
GKT-VT Series  SMD Aluminum Electrolytic Capacitors
105°C, 2000Hr
Size
Lead Time
4 x 5.4mm
4-8 weeks
5 x 5.4mm
5 x 5.8mm

Thursday, January 3, 2019

Kt Kingtronics Have a Try with Fast Lead Time of Trimmer Potentiometer

Through years efforts, we have been working on not only best quality but also competitive offer for our valued customers~
Below you can find our faster lead time in global electronic market for our Trimmers. Feel free to have a try !
Please let us know if there is any scope to work together in coming New Year !

Monday, July 16, 2018

Kt Kingtronics File Global Lead Time Information in Electronics Industry

ACTIVES
 
Technology
Manufacturer
Current Lead-Times
Lead-Times Trend
Comments
 
 
Diodes Inc
12-24
Increasing
Schottky rectifiers SOT23 and SOD323 20- 24 weeks, PDI123 21 weeks, SBR TO220AB 12-20 weeks, SMA 16-18 weeks.
 
Vishay
16-52
Increasing
There are increased lead times in SMA, SMB, SMC, TO-220, TO-263 and DPAK. Schottkys are most affected with 40-52 weeks lead time.
 
ON Semiconductor
18-42
Increasing
SOD123 flat lead, SOT23 copper and SMA Flat lead 36-42 weeks lead time. Automotive parts 26-32 weeks
 
STMicroelectronics
20-33
Increasing
TURBO 2 Ultrafast High Voltage Rectifiers running about 20 weeks. Everything else is 25-33 weeks.
 
Fairchild
12-14
Stable
 
 
Diodes Inc
12-16
Increasing
 
 
Littelfuse
16
Increasing
Purchased ON Semi TVS business Lead times 24 weeks
 
Vishay
25-40
Increasing
SMC at 25 weeks SMA and SMB at 40
 
STMicroelectronics
8
Stable
 
 
Diodes Inc
12-22
Increasing
 
 
Nexperia
20-40
Increasing
SOT23SD/DD from 20 to 45 weeks - SOD523 from 40 weeks - - SOT 89 40 WEEKS - SOT323SD/DD from 40 weeks SOT363 from 30 to 40 weeks SOT353P 20-40 WEEKS SOD123F 30 WEEKS DHVQFN14/16/20/24 from 12 to 24 weeks – DFN PACKAGES 20 weeks – SOD 323 26 WEEKS – SOT 223 40 WEEKS – DSN PACKAFES 20 WEEKS
 
ON Semiconductor
20-40
Increasing
SMA 23-40 WEEKS – SMB 23-40 WEEKS – SMC 28-33 WEEKS – SOT 23 COPPER 20-45 WEEKS – SOT 89 16-30 WEEKS – SOT223 40 WEEKS – TO220 16-22 WEEKS – SOD 923 18-22 WEEKS – SOIC-8-14-16 20-30 WEEKS – SOD123 COPPER 20-30 WEEKS – SOD 323 DPAK 20-30 WEEKS – DFN PACK 20-52 WEEKS – SC 70 18-30 WEEKS
 
Fairchild
16-45
Increasing
 
 
Switching Diodes
Diodes Inc
12-22
Increasing
 
 
Fairchild
16-45
Increasing
 
 
ON Semiconductor
16-40
Increasing
SMA 23-40 WEEKS – SMB 23-40 WEEKS – SMC 28-33 WEEKS – SOT 23 COPPER 20-45 WEEKS – SOT 89 16-30 WEEKS – SOT223 40 WEEKS – TO220 16-22 WEEKS – SOD 923 18-22 WEEKS – SOIC-8-14-16 20-30 WEEKS – SOD123 COPPER 20-30 WEEKS – SOD 323 DPAK 20-30 WEEKS – DFN PACK 20-52 WEEKS – SC 70 18-30 WEEKS
 
Nexperia
20-40
Increasing
SOT23SD/DD from 20 to 45 weeks - SOD523 from 40 weeks - - SOT 89 40 WEEKS - SOT323SD/DD from 40 weeks SOT363 from 30 to 40 weeks SOT353P 20-40 WEEKS SOD123F 30 WEEKS DHVQFN14/16/20/24 from 12 to 24 weeks – DFN PACKAGES 20 weeks – SOD 323 26 WEEKS – SOT 223 40 WEEKS – DSN PACKAFES 20 WEEKS
 
Zener Diodes
Diodes Inc
12-22
Increasing
 
 
Fairchild
10-30
Increasing
 
 
Nexperia
6-40
Increasing
SOT23SD/DD from 20 to 45 weeks - SOD523 from 40 weeks - - SOT 89 40 WEEKS - SOT323SD/DD from 40 weeks SOT363 from 30 to 40 weeks SOT353P 20-40 WEEKS SOD123F 30 WEEKS DHVQFN14/16/20/24 from 12 to 24 weeks – DFN PACKAGES 20 weeks – SOD 323 26 WEEKS – SOT 223 40 WEEKS – DSN PACKAFES 20 WEEKS
 
ON Semiconductor
12-40
Increasing
SMA 23-40 WEEKS – SMB 23-40 WEEKS – SMC 28-33 WEEKS – SOT 23 COPPER 20-45 WEEKS – SOT 89 16-30 WEEKS – SOT223 40 WEEKS – TO220 16-22 WEEKS – SOD 923 18-22 WEEKS – SOIC-8-14-16 20-30 WEEKS – SOD123 COPPER 20-30 WEEKS – SOD 323 DPAK 20-30 WEEKS – DFN PACK 20-52 WEEKS – SC 70 18-30 WEEKS
 
Vishay
12-44
Increasing
SMA SMB - 28-44 WEEKS
Diodes Inc
16-30
Increasing
DFxx series 25-30 weeks, KBPxx series 21-25 weeks.
 
Fairchild
12-42
Increasing
 
 
Vishay
19-45
Increasing
 
 
Diodes Inc
12-22
Increasing
 
 
Fairchild
10-40
Increasing
 
 
Nexperia
13-40
Increasing
SOT23SD/DD from 20 to 45 weeks - SOD523 from 40 weeks - - SOT 89 40 WEEKS - SOT323SD/DD from 40 weeks SOT363 from 30 to 40 weeks SOT353P 20-40 WEEKS SOD123F 30 WEEKS DHVQFN14/16/20/24 from 12 to 24 weeks – DFN PACKAGES 20 weeks – SOD 323 26 WEEKS – SOT 223 40 WEEKS – DSN PACKAFES 20 WEEKS
 
ON Semiconductor
12-40
Increasing
SMA 23-40 WEEKS – SMB 23-40 WEEKS – SMC 28-33 WEEKS – SOT 23 COPPER 20-45 WEEKS – SOT 89 16-30 WEEKS – SOT223 40 WEEKS – TO220 16-22 WEEKS – SOD 923 18-22 WEEKS – SOIC-8-14-16 20-30 WEEKS – SOD123 COPPER 20-30 WEEKS – SOD 323 DPAK 20-30 WEEKS – DFN PACK 20-52 WEEKS – SC 70 18-30 WEEKS
 
Rohm Semiconductor
10-60
Increasing
The following packages have been extended to 40 weeks CPT - TSMT356 - TSMT36M - TSMT8 - TSMT8M - SOP8 - UMD2M - USM - EMD2M - EMD2 - TUSH/TUMD2S - PMDU - PMDUM – PSM – PMDS - SSOP5 - SSOP6
 
PASSIVES
 
Trimmers & Pots
BI Tech
8-12
Stable
 
 
Piher
10-14
Stable
 
 
Panasonic
14-16
Decreasing
Pots will be EOL by the end of 2017
 
Vishay
10-14
Stable
 
 
NIC Components
18-20
Increasing
Leadtimes pushed out. Some pricing has been increased. Pushouts some cases 40 weeks
 
Nichion
18-28
Stable
SMD 10x10,8x10,6.3x7.7 Leadtimes coming down now between 18-24, Snap-in still 28-30, price increases happening
 
Surge
14-19
Increasing
Lead-times pushing out closing on 20 weeks on some products
 
Panasonic
14-18
Decreasing
Some SMD dropping from 18 to 16 weeks. Some price increases.
 
United Chemicon
16-20
Increasing
Leadtimes increasing the 18-20 weeks
 
AVX
20-28
Increasing
Long lead-times across all case sizes
 
Vishay
15-20
Increasing
Lead-times extending on small case sizes A & B
 
Leaded Capacitors - Ceramic
AVX
18-20
Stable
 
 
Murata
18-20
Stable
A lot of parts EOL'd
 
Vishay
12-16
Stable
 
 
NIC Components
14-18
Increasing
 
 
TDK
14-20
Increasing
 
 
urface Mount General Capacitors – Ceramic
AVX
24+
Increasing
Automotive Specs Sold Out, Allocation on 44 series of parts. Controlled order entry on long list of parts
 
Murata
20-38+
Increasing
Controlled order entry on a long list of parts, mostly large case sizes. EOL notification on many parts
 
Samsung
24+
Increasing
Lead times under pressure, price increases in Q1 2018
 
TDK
24+
Increasing
On severe allocation
 
Taiyo Yuden
30+
Increasing
On severe allocation
 
NIC Components
24+
Increasing
 
 
Yageo
38+
Increasing
Price increase in Q1 2018, Controlled order entry on long list of parts
 
Walsin
40+
Increasing
 
 
Vishay
16+
Stable