Kt Kingtronics Offers Stable Price and Shorter L/T for Aluminum Electrolytic Capacitors


Did your suppliers of aluminum electrolytic capacitors inform that price and L/T will increase much more in near future?

Kingtronics can offer you stable price and shorter L/T than those top suppliers as below. Our lead time is only about 5-9 weeks.

We can also discuss more at Electronica 2018 in Munich. Do you have plan for it?

  TechnologyManufacturerLead-TimesLead-Times TrendComments
Electrolytic CapacitorsNIC Components18-20IncreasingL/T pushed out. Some pricing has been increased. Pushouts some cases 40 weeks
Nichion18-28StableSMD 10x10,8x10,6.3x7.7 L/T coming down now between 18-24, Snap-in still 28-30, price increases happening
Surge14-19IncreasingLead-times pushing out closing on 20 weeks on some products
Panasonic14-18DecreasingSome SMD dropping from 18 to 16 weeks. Some price increases.
United Chemicon16-20IncreasingL/T increasing the 18-20 weeks

Wednesday, July 18, 2018

Kt Kingtronics SMD Type Aluminum Electrolytic Capacitors Application

1.Wide range of using in lighting equipment (LED equipment), automotive electronics, intelligent products, automation equipment and so on.

2. Energy products: large industrial power supply

3. Office equipment/network communication apparatus: credit card machine, fax machine, iPod

4. Industrial instrumentation: power regulators, professional power supplies

5. White goods: audio apparatus, TV sets, VCRs, washing machine 

6. Automotive equipment: head-up display, AV system , digital driving recorder

7. Medical equipment: sphygmomanometer, ECG equipment, handheld electronic blood glucose meter

Supplier Company: Kingtronics International Company www.kingtronics.com
ISO 9001: 2015 manufacturer, 2 factories, ISO & UL & SGS certified.


Monday, July 16, 2018

Kt Kingtronics File Global Lead Time Information in Electronics Industry

ACTIVES
 
Technology
Manufacturer
Current Lead-Times
Lead-Times Trend
Comments
 
 
Diodes Inc
12-24
Increasing
Schottky rectifiers SOT23 and SOD323 20- 24 weeks, PDI123 21 weeks, SBR TO220AB 12-20 weeks, SMA 16-18 weeks.
 
Vishay
16-52
Increasing
There are increased lead times in SMA, SMB, SMC, TO-220, TO-263 and DPAK. Schottkys are most affected with 40-52 weeks lead time.
 
ON Semiconductor
18-42
Increasing
SOD123 flat lead, SOT23 copper and SMA Flat lead 36-42 weeks lead time. Automotive parts 26-32 weeks
 
STMicroelectronics
20-33
Increasing
TURBO 2 Ultrafast High Voltage Rectifiers running about 20 weeks. Everything else is 25-33 weeks.
 
Fairchild
12-14
Stable
 
 
Diodes Inc
12-16
Increasing
 
 
Littelfuse
16
Increasing
Purchased ON Semi TVS business Lead times 24 weeks
 
Vishay
25-40
Increasing
SMC at 25 weeks SMA and SMB at 40
 
STMicroelectronics
8
Stable
 
 
Diodes Inc
12-22
Increasing
 
 
Nexperia
20-40
Increasing
SOT23SD/DD from 20 to 45 weeks - SOD523 from 40 weeks - - SOT 89 40 WEEKS - SOT323SD/DD from 40 weeks SOT363 from 30 to 40 weeks SOT353P 20-40 WEEKS SOD123F 30 WEEKS DHVQFN14/16/20/24 from 12 to 24 weeks – DFN PACKAGES 20 weeks – SOD 323 26 WEEKS – SOT 223 40 WEEKS – DSN PACKAFES 20 WEEKS
 
ON Semiconductor
20-40
Increasing
SMA 23-40 WEEKS – SMB 23-40 WEEKS – SMC 28-33 WEEKS – SOT 23 COPPER 20-45 WEEKS – SOT 89 16-30 WEEKS – SOT223 40 WEEKS – TO220 16-22 WEEKS – SOD 923 18-22 WEEKS – SOIC-8-14-16 20-30 WEEKS – SOD123 COPPER 20-30 WEEKS – SOD 323 DPAK 20-30 WEEKS – DFN PACK 20-52 WEEKS – SC 70 18-30 WEEKS
 
Fairchild
16-45
Increasing
 
 
Switching Diodes
Diodes Inc
12-22
Increasing
 
 
Fairchild
16-45
Increasing
 
 
ON Semiconductor
16-40
Increasing
SMA 23-40 WEEKS – SMB 23-40 WEEKS – SMC 28-33 WEEKS – SOT 23 COPPER 20-45 WEEKS – SOT 89 16-30 WEEKS – SOT223 40 WEEKS – TO220 16-22 WEEKS – SOD 923 18-22 WEEKS – SOIC-8-14-16 20-30 WEEKS – SOD123 COPPER 20-30 WEEKS – SOD 323 DPAK 20-30 WEEKS – DFN PACK 20-52 WEEKS – SC 70 18-30 WEEKS
 
Nexperia
20-40
Increasing
SOT23SD/DD from 20 to 45 weeks - SOD523 from 40 weeks - - SOT 89 40 WEEKS - SOT323SD/DD from 40 weeks SOT363 from 30 to 40 weeks SOT353P 20-40 WEEKS SOD123F 30 WEEKS DHVQFN14/16/20/24 from 12 to 24 weeks – DFN PACKAGES 20 weeks – SOD 323 26 WEEKS – SOT 223 40 WEEKS – DSN PACKAFES 20 WEEKS
 
Zener Diodes
Diodes Inc
12-22
Increasing
 
 
Fairchild
10-30
Increasing
 
 
Nexperia
6-40
Increasing
SOT23SD/DD from 20 to 45 weeks - SOD523 from 40 weeks - - SOT 89 40 WEEKS - SOT323SD/DD from 40 weeks SOT363 from 30 to 40 weeks SOT353P 20-40 WEEKS SOD123F 30 WEEKS DHVQFN14/16/20/24 from 12 to 24 weeks – DFN PACKAGES 20 weeks – SOD 323 26 WEEKS – SOT 223 40 WEEKS – DSN PACKAFES 20 WEEKS
 
ON Semiconductor
12-40
Increasing
SMA 23-40 WEEKS – SMB 23-40 WEEKS – SMC 28-33 WEEKS – SOT 23 COPPER 20-45 WEEKS – SOT 89 16-30 WEEKS – SOT223 40 WEEKS – TO220 16-22 WEEKS – SOD 923 18-22 WEEKS – SOIC-8-14-16 20-30 WEEKS – SOD123 COPPER 20-30 WEEKS – SOD 323 DPAK 20-30 WEEKS – DFN PACK 20-52 WEEKS – SC 70 18-30 WEEKS
 
Vishay
12-44
Increasing
SMA SMB - 28-44 WEEKS
Diodes Inc
16-30
Increasing
DFxx series 25-30 weeks, KBPxx series 21-25 weeks.
 
Fairchild
12-42
Increasing
 
 
Vishay
19-45
Increasing
 
 
Diodes Inc
12-22
Increasing
 
 
Fairchild
10-40
Increasing
 
 
Nexperia
13-40
Increasing
SOT23SD/DD from 20 to 45 weeks - SOD523 from 40 weeks - - SOT 89 40 WEEKS - SOT323SD/DD from 40 weeks SOT363 from 30 to 40 weeks SOT353P 20-40 WEEKS SOD123F 30 WEEKS DHVQFN14/16/20/24 from 12 to 24 weeks – DFN PACKAGES 20 weeks – SOD 323 26 WEEKS – SOT 223 40 WEEKS – DSN PACKAFES 20 WEEKS
 
ON Semiconductor
12-40
Increasing
SMA 23-40 WEEKS – SMB 23-40 WEEKS – SMC 28-33 WEEKS – SOT 23 COPPER 20-45 WEEKS – SOT 89 16-30 WEEKS – SOT223 40 WEEKS – TO220 16-22 WEEKS – SOD 923 18-22 WEEKS – SOIC-8-14-16 20-30 WEEKS – SOD123 COPPER 20-30 WEEKS – SOD 323 DPAK 20-30 WEEKS – DFN PACK 20-52 WEEKS – SC 70 18-30 WEEKS
 
Rohm Semiconductor
10-60
Increasing
The following packages have been extended to 40 weeks CPT - TSMT356 - TSMT36M - TSMT8 - TSMT8M - SOP8 - UMD2M - USM - EMD2M - EMD2 - TUSH/TUMD2S - PMDU - PMDUM – PSM – PMDS - SSOP5 - SSOP6
 
PASSIVES
 
Trimmers & Pots
BI Tech
8-12
Stable
 
 
Piher
10-14
Stable
 
 
Panasonic
14-16
Decreasing
Pots will be EOL by the end of 2017
 
Vishay
10-14
Stable
 
 
NIC Components
18-20
Increasing
Leadtimes pushed out. Some pricing has been increased. Pushouts some cases 40 weeks
 
Nichion
18-28
Stable
SMD 10x10,8x10,6.3x7.7 Leadtimes coming down now between 18-24, Snap-in still 28-30, price increases happening
 
Surge
14-19
Increasing
Lead-times pushing out closing on 20 weeks on some products
 
Panasonic
14-18
Decreasing
Some SMD dropping from 18 to 16 weeks. Some price increases.
 
United Chemicon
16-20
Increasing
Leadtimes increasing the 18-20 weeks
 
AVX
20-28
Increasing
Long lead-times across all case sizes
 
Vishay
15-20
Increasing
Lead-times extending on small case sizes A & B
 
Leaded Capacitors - Ceramic
AVX
18-20
Stable
 
 
Murata
18-20
Stable
A lot of parts EOL'd
 
Vishay
12-16
Stable
 
 
NIC Components
14-18
Increasing
 
 
TDK
14-20
Increasing
 
 
urface Mount General Capacitors – Ceramic
AVX
24+
Increasing
Automotive Specs Sold Out, Allocation on 44 series of parts. Controlled order entry on long list of parts
 
Murata
20-38+
Increasing
Controlled order entry on a long list of parts, mostly large case sizes. EOL notification on many parts
 
Samsung
24+
Increasing
Lead times under pressure, price increases in Q1 2018
 
TDK
24+
Increasing
On severe allocation
 
Taiyo Yuden
30+
Increasing
On severe allocation
 
NIC Components
24+
Increasing
 
 
Yageo
38+
Increasing
Price increase in Q1 2018, Controlled order entry on long list of parts
 
Walsin
40+
Increasing
 
 
Vishay
16+